An Introduction to the Basics of Well Completion, Stimulations and Workovers

после оплаты (24/7)
(для всех устройств)
(в т.ч. для Apple и Android)
Introduction: Basic Well Completion ConceptsIntroduction: GeologyWell PlanningDrilling the Pay, Selecting the Interval and the Initial DesignCasing DesignCementingPacker Selection and Tubing ForcesWell Heads, Chokes and SSSVsCorrosion and ErosionInflow Performance, Tubing Selection, and Artificial LiftSpecial Completions (Deviated, Thermal Multiples, and Multi-Laterals)PerforatingFormation Damage - Causes and PreventionsFormation and Damage DiagnosisChemical and Thermal StimulationFracturingUnstable Formations and Sand ControlWorkovers and FluidsHigh Temperature, High Pressure CompletionsWater Production ControlWireline and Coiled Tubing OperationsWorkover FishingPlug and Abandonment ProceduresEffects of Completion, Stimulation and Workover Activities on Surface Facility
LF/707823/R
Характеристики
- ФИО Автора
- George E. King
- Язык
- Английский
- Дата выхода
- 1998