No807 Electrometallurgy of steel and ferroalloys: Sect.: Calculations for equipment and technology with the use of computers: manual

No807 Electrometallurgy of steel and ferroalloys: Sect.: Calculations for equipment and technology with the use of computers: manual

book type
0 Review(s) 
LF/325333349/R
Russian
In stock
грн95.00
грн85.50 Save 10%

  Instant download 

after payment (24/7)

  Wide range of formats 

(for all gadgets)

  Full book 

(including for Apple and Android)

Book 807 Electrometallurgy of steel and ferroalloys: . : Calculations for equipment and technology with the use of computers: training. the Handbook of the Authors Grigoryan V. A. , Egorova A. In. , Belyanchikova L. N. , Wet And . A. and others is a unique publication that will become an indispensable assistant for students, graduate students and specialists in the field of metallurgy, as well as for everyone who is interested in modern technologies in the production of steel and ferroalloys. This book immerses the reader in the fascinating world of electrometallurgy, revealing the basic principles and processes that underlie the production of steel and ferroalloys. The authors carefully worked through the material to provide readers not only with theoretical knowledge, but also with the practical skills necessary to perform calculations on equipment and technology. The manual discusses current methods used in the metallurgical industry, as well as gives recommendations on the use of computers for process optimization. Who can be interested in this book? First of all, it is intended for students and teachers of technical universities studying in specialties related to metallurgy, mechanical engineering and engineering . However, they are not the only ones who will find useful information in it .. Specialists working in metallurgical enterprises, engineers and technologists will also be able to extract a lot of useful information from the manual. The book will be interesting for those who seek to deepen their knowledge in the field of modern technologies and processes related to the production of steel and ferroalloys. The topics raised in the book are very diverse and relevant. The authors address issues related to both traditional and innovative production methods, and also consider the impact of new technologies on the efficiency and safety of processes. An important aspect is the use of computers for calculations, which makes it possible to significantly speed up and simplify the processes of designing and optimizing equipment. This makes the manual not only a theoretical but also a practical guide that can be used in real-world settings. The style of the authors is distinguished by the clarity and accessibility of the presentation, which makes it easy to perceive even the most complex topics. They use illustrative examples and illustrations, which makes the material more understandable and interesting. Grigoryan, Egorov, Belyanchikov and Mokrov are authors whose names are already known in scientific circles. They have extensive experience in the field of metallurgy and have written many scientific articles and textbooks, which confirms their authority and professionalism. If you are looking for literature that will help you understand the intricacies of electrometallurgy, as well as teach you to apply modern technologies in calculations and design, then this guide is exactly what you need. The book “No. 807 Electrometallurgy of Steel and Ferroalloys” will become your reliable companion in the study of this complex but fascinating area. Do not miss the opportunity to enrich your knowledge and skills that will help you in the future to become a real professional in the metallurgical industry.
LF/325333349/R

Data sheet

Name of the Author
А. В.
Белянчиков
В. А.
Григорян
Егоров
И. А.
Л. Н.
Мокров
др.
Language
Russian
Release date
1988

Reviews

Write your review

No807 Electrometallurgy of steel and ferroalloys: Sect.: Calculations for equipment and technology with the use of computers: manual

Book 807 Electrometallurgy of steel and ferroalloys: . : Calculations for equipment and technology with the use of computers: training. the Handbook of the Auth...

Write your review

15 books by the same author:

Products from this category: